Skip to main content

Datasets

[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [87486]
Gecontroleerd overstromingsgebied Kruibeke-Bazel-Rupelmonde: ontwerp in- en uitwateringssluizen. Rapport projectondersteuning
International Marine and Dredging Consultants (2002). Gecontroleerd overstromingsgebied Kruibeke-Bazel-Rupelmonde: ontwerp in- en uitwateringssluizen. Rapport projectondersteuning. Versie 1.0. Waterbouwkundig Laboratorium en Hydrologisch Onderzoek: Antwerpen. II, 28 pp.

Available in  Author 
  • Waterbouwkundig Laboratorium: Open Repository 311378 [ OWA ]
  • Waterbouwkundig Laboratorium: Rapporten I27 [78803]
Document type: Project report

Keywords
    Design
    Hydraulic structures > Culverts
    Hydraulic structures > Dikes, shores and other flood defenses > Failure mechanisms
    Literature and desktop study
    Structures > Hydraulic structures > Barrages > Weirs
    Topographic features > Landforms > Flood plains
    Belgium, Zeeschelde, GOG 'Kruibeke, Bazel, Rupelmonde' [Marine Regions]

Author  Top 
  • International Marine and Dredging Consultants, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Author